Standing at 38 stories each, Sterling Crest Twin Towers house Fortune 500 corporate headquarters. Shraddha Services executed the turnkey design and installation of the vertical multi-stage wet riser network, staircase positive pressurization systems, and fiber-optic networked alarm panels.
The system features redundant automated pressure relief valves preventing pipe burst at lower basement levels while maintaining 7 bar working pressure on the 38th story helipad landing valves.
Commissioned with 100% statutory clearance, hydrostatic pressure compliance certificates, and final Municipal Fire Department sign-off.
Consult an engineer about similar turnkey installations.